Abstract: The full quantization treatment of leachate membrane concentrate in waste incineration power plants is of great significance to the environmental benefits, economic benefits and social benefits of waste incineration power plants. A waste incineration power plant was taken as an example, the full treatment process of leachate membrane concentrate was calculated and analyzed. The result showed that a refined combination of methods including reducing concentrate by membrane, spraying back into the incinerator, and submerged combustion evaporation technology could achieve low energy consumption and zero discharge of leachate membrane concentrates, and the goal of zero discharge of liquid, solid and gas could be achieved at the same time.

Key words: domestic waste incineration plant, leachate, membrane concentrate, zero discharge, fully quantized processing

[1] ZENG Fan, ZHAO Xinyi, LIAO Xiaofeng, ZHANG Jun, SHEN Lanlan, QIU Qili, DING Keqiang. Alleviation Effect of Corn Straw on Acid Inhibition in Combined Anaerobic Digestion of Mixture System [J]. Environmental Sanitation Engineering, 2023, 31(2): 63-69.
[2] MA Zhuang, CHEN Zengfeng, HU Jian, PAN Aodong, LI Xinyu, WU Weixiang. Pilot-Scale Research of Micro-Oxygen Aeration Process for Landfill Leachate Treatment [J]. Environmental Sanitation Engineering, 2023, 31(1): 74-80.
[3] HU Ludan, SHAO Liming, PU Hongxia, WANG Sujun, WEI Xinqing, HE Pinjing. Preliminary Study on Influencing Factors of Leachate Irrigation Evaporation in Arid Loess Area [J]. Environmental Sanitation Engineering, 2022, 30(6): 1-5,10.
[4] CAI Mingjin. The MVR Forced Cycle Evaporation Technology for the Treatment of the Landfill Leachate Membrane Concentrate [J]. Environmental Sanitation Engineering, 2022, 30(6): 16-21.
[5] LONG Jisheng, HUANG Yichen, ZONG Haifeng, YANG Dekun, ZHENG Yunzhong. Pilot Scale Study on the Leachate Treatment Process of Chemical Softening Coupling Membrane [J]. Environmental Sanitation Engineering, 2022, 30(5): 26-30.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!
Copyright © Environmental Sanitation Engineering
Address: 107#, Weidi Road, Tianjin, P.R.C.    Postcode: 300201
Telephone: 022-28365069   Fax: 022-28365080 E-mail: csglwyjs10@tj.gov.cn
Supported by:Beijing Magtech