Environmental Sanitation Engineering ›› 2019, Vol. 27 ›› Issue (6): 49-52.

Previous Articles     Next Articles

Pilot Test Study on Vertical Expansion in Sludge Landfill Area

Zhang Meilan1, Mao Zhongrong1, Zhang Jun1, Tang Wenrong1, Tang Ji1, Zhao Lianquan2   

  1. 1. Shanghai Laogang Waste Disposal Co. Ltd.,; 2. Shanghai Chengtou Environment (Group) Co. Ltd.,
  • Online:2019-12-26 Published:2020-01-03

Abstract: Aiming at the problem of insufficient landfill capacity of sludge with 60% moisture content in Shanghai, the key technical problems of increasing the capacity of sludge landfill in Laogang comprehensive landfill were explored. The pilot test study was carried out to improve the strength and bearing capacity of the buried sludge through in-situ reinforcement and honeycomb reinforcement of the geo-grid. The strength and stability of the vertical expanded pile body was improved through layered reinforcement of high-strength geo-textiles, which successfully achieved the vertical expanded height of 10 m. Based on the results of the pilot test, the values of soil strength of various kinds of sludge during the stability calculation were suggested, and some advices of vertical expansion for sludge in landfill were given.

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] . Optimization Study on Effect Evaluation Index for Source Separation of Municipal Solid Waste Based on F-measure   [J]. Environmental Sanitation Engineering, 2018, 26(3): 1 -3 .
[2] . Exploration and Research on Improving the Classification Effect of Domestic Garbage in Guangzhou   [J]. Environmental Sanitation Engineering, 2018, 26(3): 4 -7 .
[3] . Municipal Sewage Sludge Co-firing in Waste Incineration Power Plant: A Case Study of Hengyang City   [J]. Environmental Sanitation Engineering, 2018, 26(3): 14 -17 .
[4] . Study on Influencing Factors of Municipal Solid Waste Heating Value in Taiyuan   [J]. Environmental Sanitation Engineering, 2018, 26(3): 29 -32 .
[5] . Inhibition Concentration and Elimination Method of Ammonia Nitrogen in Anaerobic Digestion Process   [J]. Environmental Sanitation Engineering, 2018, 26(3): 33 -35 .
[6] . Operation Management Acceptance and Detection Analysis of Closed Waste Cleaning Stations in Beijing   [J]. Environmental Sanitation Engineering, 2018, 26(3): 49 -51 .
[7] . Discussion on Optimum Design of UASB Reactor for Leachate   [J]. Environmental Sanitation Engineering, 2018, 26(3): 63 -67 .
[8] . Engineering Design of Construction Waste Reclamation in Daxing District of Beijing   [J]. Environmental Sanitation Engineering, 2018, 26(3): 71 -74 .
[9] . Technology Upgrading and Architectural Design on Relieving NIMBY Problem of MSW Incineration Power Plant in#br# Mingzhou of Ningbo   [J]. Environmental Sanitation Engineering, 2018, 26(3): 75 -77 .
[10] . Types and Application Conditions of Municipal Solid Waste Waterway Transportation at Home and Abroad   [J]. Environmental Sanitation Engineering, 2018, 26(3): 78 -83 .
Copyright © Environmental Sanitation Engineering
Address: 107#, Weidi Road, Tianjin, P.R.C.    Postcode: 300201
Telephone: 022-28365069   Fax: 022-28365080 E-mail: csglwyjs10@tj.gov.cn
Supported by:Beijing Magtech