环境卫生工程 ›› 2025, Vol. 33 ›› Issue (2): 38-41.doi: 10.19841/j.cnki.hjwsgc.2025.02.005

• 固体废物分选与资源化利用 • 上一篇    下一篇

排水管渠污泥处理技术研究及工程设计

孙亚全,杨 雯,吴 琼,杨 潞   

  1. 中国市政工程中南设计研究总院有限公司
  • 出版日期:2025-04-28 发布日期:2025-04-28

Research and Engineering Design of Sewer Sludge Treatment Technologies

SUN Yaquan, YANG Wen, WU Qiong, YANG Lu   

  1. Central and Southern China Municipal Engineering Design & Research Institute Co. Ltd.
  • Online:2025-04-28 Published:2025-04-28

摘要: 随着城市的发展,环保要求日益严格,排水管渠清淤污泥的出路问题逐渐引起管理部门的重视,也成为城市面临的难题。对我国多个管渠污泥处理站进行调研,并分析其采用的工艺及存在的问题。在此基础上,以武汉市某管渠污泥处理站为例,结合项目自身特点,采用对下游污水处理厂影响较小的“预处理+多级分离+机械脱水”联合处理工艺。处理后共产生4种渣料,分别为粒径≥100.0 mm的砖块、石头、树根、塑料等;粒径为3.0~<100.0 mm的石块、塑料、浮渣等,含水率为11.4%;粒径为0.2~<3.0 mm的砂、有机物等,含水率为21.8%;粒径<0.2 mm的粉砂,含水率为25.7%。按满负荷运行进行测算,单位运行成本为75.53元/t。同时,总结了运行以来存在的问题,以期为后续排水管渠污泥处理项目提供借鉴。

关键词: 排水管渠污泥, 多级分离, 机械脱水

Abstract: With the development of the city, environmental protection requirements are increasingly strict, and the problem of sewer sludge outlet has gradually attracted the attention of the management department, and has also become a problem faced by the city. A number of sewage sludge treatment stations in China were investigated and their processes and existing problems were analyzed. On this basis, a sewage sludge treatment station in Wuhan was taken as an example, and combined with the characteristics of the project, the combined treatment process of “pretreatment + multistage separation + mechanical dehydration”, which has little influence on the downstream sewage treatment plant, was adopted. After treated, four types of residues were generated: bricks, stones, tree roots, plastics, etc., with a particle size greater than 100.0 mm; stones, plastics, scum, etc., with a particle size between 3.0 and 100.0 mm (not including 100.0 mm) and a moisture content of 11.4%; sand, organic matter, etc., with a particle size between 0.2 and 3.0 mm (not including 3.0 mm) and a moisture content of 21.8%; and silt with a particle size smaller than 0.2 mm and a moisture content of 25.7%. The unit operation cost in the station was 75.53 yuan/t according to the calculation of full load operation. At the same time, the problems existed since the operation were summarized in order to provide reference for the subsequent sewage sludge treatment projects.

Key words: sewer sludge, multistage separation, mechanical dehydration

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!
版权所有 © 天津市城市管理研究中心
津ICP备2022007900号-1   津公网安备 12010302000952号   中央网信办违法和不良信息举报中心
地址:天津市河西区围堤道107号    邮政编码: 300201
电话: 022-28365069 传真: 022-28365080 E-mail: csglwyjs10@tj.gov.cn
本系统由北京玛格泰克科技发展有限公司设计开发